Impact Air Quality Monitoring Results 
1-hour TSP Monitoring Results at Station AM1A
(Fan Sin Temple, 3 Sheung Wun Yiu G/F)
Date Start 1st Hour 2nd Hour 3rd Hour
Time Conc. Conc. Conc.
(hh:mm) (µg/m3) (µg/m3) (µg/m3)
2-Nov-11 9:39 87.8 84.2 81.3
1-hour TSP Monitoring Results at Station AM2
(12 Shan Tong New Village G/F)
Date Start 1st Hour 2nd Hour 3rd Hour
Time Conc. Conc. Conc.
(hh:mm) (µg/m3) (µg/m3) (µg/m3)
2-Nov-11 9:50 88.2 83.6 81.9
1-hour TSP Monitoring Results at Station AM3
(Roof of Switch Room at Riverain Bayside)
Date Start 1st Hour 2nd Hour 3rd Hour
Time Conc. Conc. Conc.
(hh:mm) (µg/m3) (µg/m3) (µg/m3)
2-Nov-11 9:28 86.2 80.7 87.9
1-hour TSP Monitoring Results at Station AM4A
(Roof of Switch Room at 168 Shek Kwu Lung Village)
Date Start 1st Hour 2nd Hour 3rd Hour
Time Conc. Conc. Conc.
(hh:mm) (µg/m3) (µg/m3) (µg/m3)
2-Nov-11 10:22 81.9 86.0 83.4