Impact Air Quality Monitoring Results 
1-hour TSP Monitoring Results at Station AM1
(Fan Sin Temple, 3 Sheung Wun Yiu G/F)
Date Start 1st Hour 2nd Hour 3rd Hour
Time Conc. Conc. Conc.
(hh:mm) (µg/m3) (µg/m3) (µg/m3)
14-May-12 9:50 76.2 75.4 73.8
1-hour TSP Monitoring Results at Station AM2
(12 Shan Tong New Village G/F)
Date Start 1st Hour 2nd Hour 3rd Hour
Time Conc. Conc. Conc.
(hh:mm) (µg/m3) (µg/m3) (µg/m3)
14-May-12 10:10 77.2 74.6 78.2
1-hour TSP Monitoring Results at Station AM3
(Roof of Switch Room at Riverain Bayside)
Date Start 1st Hour 2nd Hour 3rd Hour
Time Conc. Conc. Conc.
(hh:mm) (µg/m3) (µg/m3) (µg/m3)
#17/05/2012 14:00 74.2 76.6 77.5
# The 24-hr TSP monitoring was rescheduled to 17 May 2012 due to the high 
volumn sampler was interrupted on 14 May 2012.
1-hour TSP Monitoring Results at Station AM4A
(Roof of of Switch Room at 168 Shek Kwu Lung Village)
Date Start 1st Hour 2nd Hour 3rd Hour
Time Conc. Conc. Conc.
(hh:mm) (µg/m3) (µg/m3) (µg/m3)
14-May-12 10:38 78.2 79.2 75.8