24-hour TSP Monitoring Results at Station AM1A (Fan Sin Temple, 3 Sheung Wun Yiu G/F)
 
Date Weather Air Atmospheric  Flow Rate (m3/min.) Av. flow Total vol. Filter Weight (g) Particulate Elapse Time Sampling Conc.
  Condition Temp. (oC) Pressure(hPa) Initial Final (m3/min) (m3) Initial Final weight(g) Initial Final  Time(hrs.) (µg/m3)
4-Jul-14 Sunny 30.9 1004.0 1.33 1.33 1.33 1913.8 2.6801 2.7266 0.0465 21147.46 21171.46 24.00 24.3
9-Jul-14 Sunny 30.8 1002.3 1.33 1.33 1.33 1913.8 2.6598 2.7812 0.1214 21171.46 21195.46 24.00 63.4
15-Jul-14 Fine 30.6 1009.8 1.33 1.33 1.33 1913.8 2.6884 2.7271 0.0387 21195.46 21219.46 24.00 20.2
Construction Phase EM&A Programme for Contract 1 of the Project was completed on 15 July 2014.
No monitoring has been carried out beyond 15 July 2014.
24-hour TSP Monitoring Results at Station AM2 (12 Shan Tong New Village G/F)
Date Weather Air Atmospheric  Flow Rate (m3/min.) Av. flow Total vol. Filter Weight (g) Particulate Elapse Time Sampling Conc.
  Condition Temp. (oC) Pressure(hPa) Initial Final (m3/min) (m3) Initial Final weight(g) Initial Final  Time(hrs.) (µg/m3)
4-Jul-14 Sunny 30.9 1004.0 1.32 1.32 1.32 1905.1 2.7422 2.7726 0.0304 17719.12 17743.12 24.00 16.0
9-Jul-14 Sunny 30.8 1002.3 1.32 1.32 1.32 1905.1 2.6473 2.7138 0.0665 17743.12 17767.12 24.00 34.9
15-Jul-14 Fine 30.6 1009.8 1.32 1.32 1.32 1905.1 2.6681 2.6909 0.0228 17767.12 17791.12 24.00 12.0
Construction Phase EM&A Programme for Contract 1 of the Project was completed on 15 July 2014.
No monitoring has been carried out beyond 15 July 2014.
24-hour TSP Monitoring Results at Station AM3 (Roof of Switch Room at Riverain Bayside)
Date Weather Air Atmospheric  Flow Rate (m3/min.) Av. flow Total vol. Filter Weight (g) Particulate Elapse Time Sampling Conc.
  Condition Temp. (oC) Pressure(hPa) Initial Final (m3/min) (m3) Initial Final weight(g) Initial Final  Time(hrs.) (µg/m3)
4-Jul-14 Sunny 30.9 1004.0 1.33 1.33 1.33 1921.0 2.7226 2.7655 0.0429 21548.59 21572.59 24.00 22.3
9-Jul-14 Sunny 30.8 1002.3 1.33 1.33 1.33 1921.0 2.6553 2.7774 0.1221 21572.59 21596.59 24.00 63.6
15-Jul-14 Fine 30.6 1009.8 1.33 1.33 1.33 1921.0 2.6697 2.7050 0.0353 21596.59 21620.59 24.00 18.4
Construction Phase EM&A Programme for Contract 1 of the Project was completed on 15 July 2014.
No monitoring has been carried out beyond 15 July 2014.
24-hour TSP Monitoring Results at Station AM4A (Roof of Switch Room at 168 Shek Kwu Lung Village)
Date Weather Air Atmospheric  Flow Rate (m3/min.) Av. flow Total vol. Filter Weight (g) Particulate Elapse Time Sampling Conc.
  Condition Temp. (oC) Pressure(hPa) Initial Final (m3/min) (m3) Initial Final weight(g) Initial Final  Time(hrs.) (µg/m3)
4-Jul-14 Sunny 30.9 1004.0 1.33 1.33 1.33 1918.1 2.7215 2.7469 0.0254 17578.59 17602.59 24.00 13.2
9-Jul-14 Sunny 30.8 1002.3 1.33 1.33 1.33 1918.1 2.6404 2.6892 0.0488 17602.59 17626.59 24.00 25.4
15-Jul-14 Fine 30.6 1009.8 1.33 1.33 1.33 1918.1 2.6405 2.6584 0.0179 17626.59 17650.59 24.00 9.3
21-Jul-14 Fine 29.7 1005.5 1.33 1.33 1.33 1918.1 2.7328 2.7906 0.0578 17650.59 17674.59 24.00 30.1
26-Jul-14 Sunny 28.4 1008.8 1.33 1.33 1.33 1918.1 2.7016 2.7576 0.0560 17674.59 17698.59 24.00 29.2