Impact Air Quality Monitoring Results 
24-hour TSP Monitoring Results at Station AM1A (Fan Sin Temple, 3 Sheung Wun Yiu G/F)
 
Date Weather Air Atmospheric  Flow Rate (m3/min.) Av. flow Total vol. Filter Weight (g) Particulate Elapse Time Sampling Conc.
  Condition Temp. (oC) Pressure(hPa) Initial Final (m3/min) (m3) Initial Final weight(g) Initial Final  Time(hrs.) (µg/m3)
Construction Phase EM&A Programme for Contract 1 of the Project was completed on 15 July 2014.
No monitoring has been carried out beyond 15 July 2014.
24-hour TSP Monitoring Results at Station AM2 (12 Shan Tong New Village G/F)
Date Weather Air Atmospheric  Flow Rate (m3/min.) Av. flow Total vol. Filter Weight (g) Particulate Elapse Time Sampling Conc.
  Condition Temp. (oC) Pressure(hPa) Initial Final (m3/min) (m3) Initial Final weight(g) Initial Final  Time(hrs.) (µg/m3)
Construction Phase EM&A Programme for Contract 1 of the Project was completed on 15 July 2014.
No monitoring has been carried out beyond 15 July 2014.
24-hour TSP Monitoring Results at Station AM3 (Roof of Switch Room at Riverain Bayside)
Date Weather Air Atmospheric  Flow Rate (m3/min.) Av. flow Total vol. Filter Weight (g) Particulate Elapse Time Sampling Conc.
  Condition Temp. (oC) Pressure(hPa) Initial Final (m3/min) (m3) Initial Final weight(g) Initial Final  Time(hrs.) (µg/m3)
Construction Phase EM&A Programme for Contract 1 of the Project was completed on 15 July 2014.
No monitoring has been carried out beyond 15 July 2014.
24-hour TSP Monitoring Results at Station AM4A (Roof of Switch Room at 168 Shek Kwu Lung Village)
Date Weather Air Atmospheric  Flow Rate (m3/min.) Av. flow Total vol. Filter Weight (g) Particulate Elapse Time Sampling Conc.
  Condition Temp. (oC) Pressure(hPa) Initial Final (m3/min) (m3) Initial Final weight(g) Initial Final  Time(hrs.) (µg/m3)
30-Sep-14 Fine 29.6 1011.1 1.33 1.33 1.33 1918.1 2.7490 2.7861 0.0371 17962.59 17986.59 24.00 19.3