Site
Inspection Summary
Contract No. |
HY/2012/06 |
Date: |
2 September 2014 |
Time: |
14:00 |
Inspection No.: |
42 |
|
Nil |
|
|
|
Follow-up
Observations |
1. |
The breaker has
been fully wrapped with absorptive materials (Closed). |
|
|
|
New
Observations |
2. |
Oil leakage was
observed under an excavator. The Contractor should clear the oil stain and
prevent oil leakage to air, soil and water bodies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
10 September 2014 |
Time: |
14:00 |
Inspection No.: |
43 |
|
Nil |
|
|
|
Follow-up
Observations |
1. |
Ground
contaminated with leaked oil was cleaned. The excavator was removed off site
for repairing. (Closed) |
|
|
|
New
Observations |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
18 September 2014 |
Time: |
14:00 |
Inspection No.: |
44 |
|
Nil |
|
|
|
Follow-up
Observations |
|
Nil. |
|
|
|
New
Observations |
1. |
Mud trails were
observed near the site entrance. The Contractor should maintain effective
wheel washing facilities and clear the mud trails left on public road. |
|
Reminders |
|
|
|
The Contractor was
reminded to divert muddy water to desilting facilities prior to discharge. |
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
23 September 2014 |
Time: |
14:00 |
Inspection No.: |
45 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
A water bowser was
arranged to wash the section of the road with mud trails near the site
entrance. (Closed) |
|
|
|
New
Observation(s) |
2. |
Stagnant water was
observed. The Contractor should clear the stagnant water to prevent mosquito breeding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
30 September 2014 |
Time: |
14:00 |
Inspection No.: |
46 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
Stagnant water was
cleared. (Closed) |
|
|
|
New
Observation(s) |
2. |
Chemicals were
observed on bare ground without drip trays. The Contractor should provide
drip trays to chemicals to prevent any oil leakage. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |