Site
Inspection Summary
Contract No. |
HY/2012/06 |
Date: |
4 November 2014 |
Time: |
14:00 |
Inspection No.: |
51 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
|
Nil. |
|
|
|
New
Observation(s) |
1. |
Stockpile
of dusty materials were observed without dust suppression measures. The
Contractor should spray the stockpiles with water or cover them entirely by
tarpaulin for dust suppression. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
13 November 2014 |
Time: |
14:00 |
Inspection No.: |
52 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
Stockpile of dusty
materials was covered. (Closed) |
|
|
|
New
Observation(s) |
|
Nil. |
|
Reminder(s) |
|
Site area ID1 was observed to be dry. The
Contractor was reminded to enhance the water spraying frequency for dust
suppression. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
18 November 2014 |
Time: |
14:00 |
Inspection No.: |
53 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
|
Nil. |
|
|
|
New
Observation(s) |
|
Nil. |
|
Reminder(s) |
|
The site area of Zone 1 was observed to be dry.
The Contractor was reminded to set up watering facilities as soon as possible
and enhance the water spraying frequency to suppress dust. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
25 November 2014 |
Time: |
14:00 |
Inspection No.: |
54 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
|
Nil. |
|
|
|
New
Observation(s) |
1. |
Stagnant water and
general refuse was observed at ID1. The Contractor should clear the stagnant
water and refuse to prevent mosquito breeding and maintain good housekeeping. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |