Site
Inspection Summary
Contract No. |
HY/2012/06 |
Date: |
6 January 2015 |
Time: |
14:00 |
Inspection No.: |
60 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
General refuse has
been cleared. (Closed) |
|
|
|
New
Observation(s) |
2. |
Dry soil surface
was observed. The Contractor should enhance the water spraying frequency for
dust suppression. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
15 January 2015 |
Time: |
14:00 |
Inspection No.: |
61 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
The
ground surface at the area has been compacted as a dust suppression measure
and additional watering has been arranged. (Closed) |
|
|
|
New
Observation(s) |
2. |
Stagnant water was
observed in the drip tray in Area 346. The Contractor should clear the
stagnant water to prevent mosquito breeding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
20 January 2015 |
Time: |
14:00 |
Inspection No.: |
62 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
Stagnant
water observed in the drip tray in Area 346 was cleared. (Closed) |
|
|
|
New
Observation(s) |
2. |
Stagnant water was
observed in a tray in ID1. The Contractor should clear the stagnant water to
prevent mosquito breeding. |
3. |
General
refuse was accumulating at ID1. The Contractor should dispose of the general
refuse regularly to maintain site hygiene and tidiness. |
|
|
|
Reminder |
|
|
|
The
Contractor was reminded to wrap the breaking tip of the breaker with
sound-proof materials to minimize noise generation during breaking activities. |
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
27 January 2015 |
Time: |
14:00 |
Inspection No.: |
63 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
Stagnant
water observed in the tray in ID1 was cleared. (Closed) |
2. |
General refuse at
ID1 was cleared. (Closed) |
|
New
Observation(s) |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Nil |