Site
Inspection Summary
Contract No. |
HY/2012/06 |
Date: |
3 February 2015 |
Time: |
14:00 |
Inspection No.: |
64 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
|
Nil. |
|
|
|
New
Observation(s) |
|
Nil. |
|
Reminder(s) |
|
The Contractor was
reminded to cover soil stockpiles entirely with tarpaulin for dust
suppression. |
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
12 February 2015 |
Time: |
14:00 |
Inspection No.: |
65 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
|
Nil. |
|
|
|
New
Observation(s) |
1. |
Muddy water was
observed on public road outside various site entrances. The Contractor should
clear the muddy water regularly and review the wheel-washing facilities. |
2. |
The Contractor
should enhance the watering frequency of the site area for dust suppression.
(for the general site) |
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
17 February 2015 |
Time: |
14:00 |
Inspection No.: |
66 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
The
mud on the public road has been cleared. (Closed) |
2. |
Manual watering of
the site area has been arranged. (Closed) |
|
New
Observation(s) |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
24 February 2015 |
Time: |
14:00 |
Inspection No.: |
67 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
|
Nil. |
|
|
|
New
Observation(s) |
1. |
Oil
leakage was observed from the compactor. The Contractor should provide a drip
tray to retain the oil leakage and dispose of the stained soil properly as
chemical waste. |
|
|
|
|
|
|
|
|
|
|
|