Site
Inspection Summary
Contract No. |
HY/2012/06 |
Date: |
7 July 2015 |
Time: |
14:00 |
Inspection No.: |
86 |
|
Nil |
|
|
|
Follow-up Observation(s) |
1. |
The
public road has been cleaned and cleared of muddy water. (Closed) |
|
|
|
New
Observation(s) |
2. |
Stagnant
water was observed at the sheetpiling area. The Contractor should deploy a
pump to pump away the water and ensure the water is treated before
discharging from the construction site. |
|
Reminder(s) |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
16 July 2015 |
Time: |
14:00 |
Inspection No.: |
87 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
Stagnant
water has been cleared. (Closed) |
|
|
|
New
Observation(s) |
2. |
Dusty
materials were observed outside the site entrances of ID1 and near NB59. The
Contractor should clean the entrances regularly to prevent dusty materials
from entering public roads. |
|
Reminder(s) |
|
The
Contractor was reminded to post the latest EP at all vehicle site entrances. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
21 July 2015 |
Time: |
14:00 |
Inspection No.: |
88 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
Dusty
material outside site entrances has been cleaned. (Closed) |
|
|
|
New Observation(s) |
2. |
The
Contractor should step up noise abatement measures to minimize noise nuisance
during construction works. The Contractor should maximize the area of the
sound-proof canvas or use equivalent measures to close the gap between the
canvas and the ground, and wrap the breaker with effective sound-proof
materials. |
|
Reminder(s) |
|
Nil. |
|
|
|
|
|
|
|
|
|
|
|
Nil |
Contract No. |
HY/2012/06 |
Date: |
28 July 2015 |
Time: |
14:00 |
Inspection No.: |
89 |
|
Nil |
|
|
|
Follow-up
Observation(s) |
1. |
The
gap between the sound-proof canvas and the ground has been filled by
water-filled barriers. The breaker has
been wrapped with sound-proof materials. (Closed) |
|
|
|
New
Observation(s) |
2. |
Stagnant
water and general refuse was observed in the drip tray. The Contractor should
clear the stagnant water and general refuse, and dispose of them as chemical
waste. |
3. |
Stagnant
water was found in the bar bending area. The Contractor should clear the
stagnant water to prevent mosquito breeding. |
|
Reminder(s) |
|
The
Contractor was reminded to ensure the pump of the pit functions properly to
effectively transfer accumulated water to the wastewater treatment facilities. |
|
|
|
|
|
|
|
Nil |