Appendix L
Statistics on Complaints, Notifications of Summons and Successful
Prosecutions
Contract No.
HY/2012/06 – Widening of Fanling Highway – Tai Hang to Wo Hop Shek Interchange
|
Date
Received
|
Subject
|
Status
|
Total
no. followed up by the ET this month
|
Total
no. followed up by the ET since project commencement
|
Environmental
complaints
|
19 December 2013
|
EPD referred a complaint from Lot no. 116 of
Fui Sha Wai at
Tai Hang of Tai Po which is concerned about the construction noise and
diesel-like smell generated from construction activities nearby which caused
nuisance and health problems on 19 December 2013 morning.
|
Closed
|
0
|
10
|
24 February 2014
|
EPD referred an air-and-odour complaint on 24
February 2014. The complainant complained about the construction site located
near the bus stop in Fui Sha Wai, Tai Hang, Tai Wo Service Road West. When
construction works were carried out, odour, white smoke and dust were
generated. The complainant asked for follow-up actions.
|
Closed
|
|||
23 October 2014
|
EPD referred an air complaint on 24
October 2014. A resident complained against the
excavation works of Tai Wo Service Road West between Nam Wah Po & Tai
Hang Tsuen, which have piled up high stockpiles, causing serious dust
nuisance to his house. The resident also complained that the
stockpiles have not been covered and watered properly. He now requires the
EPD to follow up. The location of complaint is near
Lamppost Location EB5717. |
Closed
|
|||
31 December 2014
|
EPD referred a water complaint on 31
December 2014. The complainant complained about the
muddy river outside Tai Hang Village Office on 29 December 2014. It was
suspected that the muddy water was discharged from the construction works of
the Project. He required the EPD to follow up. |
Closed
|
|||
25 March 2015
|
EPD referred a water complaint on 25
March 2015. The complainant complained about the
generation of the smell of gasoline from the Widening of Fanling Highway construction
site on Tai Wo Service Road West, causing serious nuisance to nearby houses. The situation has continued for a few
weeks and she asked the EPD to follow up as soon as possible. |
Closed
|
|||
|
5 January 2017
|
A complaint was received by the 1823
enquiry and complaint hotline on 5 January 2017. The complaint was referred
to the Environmental Team by the Contractor on 13 January 2017. The complainant complained against the
dust emission generated by the Widening of Fanling Highway construction site
on Tai Wo Service Road West near Tai Hang Village. The complainant also complained that
Highway Department did not conduct road surface cleansing, which affects
residents’ health. He/she now requires the Highway Department to follow up. |
Closed
|
|
|
|
22 May 2017 (Referred by the Contractor on 23
May 2017)
|
A complaint was received by the 1823
enquiry and complaint hotline on 22 May 2017. The complaint was referred to
the Environmental Team by the Contractor on 23 May 2017. A complainant complained that
construction noise was caused by the erection of noise barrier on Tai Wo
Service Road West near Tai Hang Village on Sunday(s). The complainant concerned about if any
Construction Noise Permit is issued by the Environmental Protection
Department. |
Closed
|
|
|
|
25 February 2018 (Referred by the Contractor
on 1 March 2018)
|
The 1823 enquiry and complaint hotline
received a complaint on 25 February 2018. The complaint was referred to the
Environmental Team by the Contractor on 1 March 2018. A complainant complained that noise
nuisance was caused continuously by road construction works at Fanling
Highway near Tai Hang Village during 01:30 to 04:00 on 25 February 2018. The complainant concerned that the
nuisance affects residence and asked for follow-up action from the related
department. |
Closed
|
|
|
|
28 September 2019
(Referred by the EPD on 28 October 2019)
|
The EPD received a complaint on 28 October 2019. The complaint
was referred to the Environmental Team by the Contractor on 28 October 2019. The complainant was regarded to the use
of powered mechanical equipment not in accordance with the conditions
stipulated in the Construction Noise Permit (CNP) - GW-RN0602-19 in Pak Wo
Road near Fanling Highway on 24 September 2019. The complainant concerned about if any
Construction Noise Permit is issued by the Environmental Protection
Department. |
Closed
|
||
|
28 October 2019
(Referred by the EPD on 14 November 2019)
|
The Buildings Department received a
complaint on 28 October 2019 through email. The complaint was referred to
Environmental Team of HY/2012/06 on 14 November 2019. The complainant complained about dust and noise nuisance
caused continuously by road construction works at Tai Wo Service Road West. |
Closed
|
||
Notification
of summons
|
-
|
-
|
-
|
0
|
0
|
Successful
Prosecutions
|
-
|
-
|
-
|
0
|
0
|
Contract No. 02/HY/2015 –
Provision of Bus-Bus Interchange on Fanling Highway Kowloon Bound
|
Date
Received
|
Subject
|
Status
|
Total
no. followed up by the ET this month
|
Total
no. followed up by the ET since project commencement
|
Environmental
complaints
|
-
|
-
|
-
|
0
|
0
|
Notification
of summons
|
-
|
-
|
-
|
0
|
0
|
Successful
Prosecutions
|
-
|
-
|
-
|
0
|
0
|